Prefab Steel Structure Workshop Warehouse Buildings Light Weight Metal Frame
* Purlin: C shape steel purlin
* Size & Color: Customized
* Payment: T/T & L/C
* Lead Time: About 30 days
* Price: 30-60 usd/sqm
* Product Origin : Beijing,China
* Shipping port: Tianjin Port
Prefab Steel Structure Warehouse is one of the main types of building structures in modern
construction engineering. It is mainly composed of H-section steel, C-section steel, and Z-section steel combination and other components. And there is different material to choose for wall and roof cladding. Besides, we can also supply windows, doors, accessories, other required item to make your unique warehouse.
Product name |
Light weight metal frame prefab steel structure workshop warehouse buildings |
Type |
Single slope, Double slope, Multi-slope |
Single span, two-span, Multi-span, Single floor, multi floors |
|
Regular shape, U shape, L shape or other irregular shape |
|
Main Steel frame |
H section steel beam and columns Material Q355 or Q235 steel. |
painted or hot-dip galvanized |
|
Secondary frame |
X or V or other type bracing, pulling rods & structs, tie bar |
angle iron, round pipe, round bar etc. |
|
Wall & roof purlin |
C/Z section steel |
hot dip galvanized, size from C120~C320, Z100~Z200 |
|
Wall & roof panel |
50mm/75mm/100mm EPS, PU, Rock wool, Glass wool sandwich panel |
glass wool roll, PE foam insulation, Aluminum foil bubble insulation |
|
Single colorful corrugated steel sheet 0.3~0. 8mm thick |
|
Aluminum composite panel |
|
Windows |
Plastic steel or Aluminum alloy windows, Louver |
Door |
Sliding doors, roll shutter doors, metal doors, etc |
Connection |
Anchor bolt, high-strength bolt, common bolt |
Accessories |
Skylight belts, ventilators, gutter, down pipe, etc. |
Packing |
on steel Pallets loaded in 40HQ or 40OT |
Installation |
Full set of drawings and video is provided to guide installation. If required, our engineer can stay at site to guide local worker to complete the installation. |
Characteristics |
|
Quick assembly |
All the components are prefabricated according to design. so the installation process is quick, thus labor and time cost is saved. |
Low cost and maintenance |
unit price range from USD25 to USD 70 per square meter according to customers request. |
Environment-friendly |
Steel is fully recyclable, and steel recycling techonoly is mature and standardized. Construction is dust free. |
♦ Steel Structure Material ♦ Roof and wall cladding system ♦ Connection material ♦ Other components
Steel Structure Material |
||
Specification |
Usage |
Image |
H steel/ I beam | Load bearing system(column, beam, crane beam, ventilation, etc) | ![]() |
C/Z steel as purlin | to fix roof and wall panel on column and beam, bearing and transfer the force from panel to column and beam | ![]() |
Circular tube, Angle Iron, Round bar, etc | Secondary components or functional components | ![]() |
steel decking | as floor supporting, the floor slab and the upper flange of the frame beam are welded with shear studs. | ![]() |
Connection material |
||
Specification |
Usage |
Image |
Foundation bolt | to connect column | ![]() |
High strength bolt Grade 10.9S | to connect main structure | ![]() |
Common bolt Grade 4.8 | Connect the secondary components like roof purlin and beam | ![]() |
Self-tapping screws | Connect roof panel and wall cladding panel | ![]() |
Rivets | Connect the flashing, etc | ![]() |
Roof and wall cladding system |
||||||
Item |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Corrugated PPGI Sheet |
EPS Sandwich Panel |
XPS Sandwich Panel |
PU Sandwich Panel |
Rock Wool Sandwich Panel | Fiberglass Wool Sandwich Panel | |
Heat Insulation |
☆ | ☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆ | ☆☆☆ |
Sound Insulation |
☆ | ☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆ | ☆☆☆ |
Waterproof |
☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆ | ☆☆☆☆ |
Fireproof |
☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆☆☆ |
Price |
☆ | ☆☆ | ☆☆☆☆ | ☆☆☆☆☆ | ☆☆☆ | ☆☆☆ |
Density |
/ | 10-14kg/m3 | 30-40kg/m3 | 35-40kg/m3 | 60-80kg/m3 | 30-50kg/m3 |
Thickness |
0.3mm to 0.8mm | 50/75/100/120/150mm | ||||
Other Insulation panel | ![]() |
![]() |
![]() |
|||
Fiberglass Wool Coil |
Foil Bubble Insulation | EPE Foam |
Other components |
|||
Item | Image |
Item |
Image |
Door | ![]() |
Gutter and downspout |
![]() |
Window | ![]() |
Ventilation | ![]() |
Accessories | ![]() |
Skylight | ![]() |
♦ Hangar ♦ Industrial warehouse ♦ Indoor stadium ♦ steel garage
♦ church ♦ Commercial building ♦ logistic center ♦ large factory
♦ car showroom ♦ cold storage house ♦ Agricultural building ♦ office
♦ school ♦ manufacturing plant ♦ chemical storage ♦ hotel
Q1. Are you manufacturing factory or trading company?
Answer: We are direct manufacturer of steel structure warehouse, workshop, chicken house, container house as well as other steel buildings. You are welcomed to visit us at any time.
Q2. What kind of installation services do you provide?
Answer: We will supply detailed installation drawings and video for free to guide installation. If needed, we can also send engineers to site as installation director.
Q3. How do you control quality?
Answer: We have established a whole inspection procedure to make sure quality at all strages of the production process, from raw material entering, production, package, loading. We can also accept SGS, BV and other testing.
Before placing order, our sales and engineers team will provide you the best solution according to your requirements. During production, we will send you material photos, production photos, finished goods photos to keep you posted about production.
Q4. Do you accept container loading inspection?
Answer: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5. Do you offer designing service for us?
Answer: Yes, of course, we have engineers with more than 10 years experience. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel), etc, we can supply you necessary drawings as per your request. If you have design that is already approved, we can also follow your design to produce it.
Q6. What is your delivery time after paying deposit?
Answer: Delivery time depends on order quantities. In general, the delivery time to nearest seaport in China will be 30 days after
receiving deposit. If you are in a hurry, we will also put your orders in prority.