Prefab Steel Structure Factory
* Spans: From 10m up to 30m wide
* Size & Shap: Can be ustomized
* Production time: About 30 days
* Payment: T/T and L/C
* Price: 30-50 usd/sqm
* Highly adaptable: Suitable for various environments
* Product Origin & Shipping port: Beijing,China &Tianjin Port
Steel Structure Factory Building
The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
The usage scale includes large-scale workshop, or warehouse, supermarkets, entertainment centers and modular steel structure garage.
Specification
Every parts can be customized base on request.
Primary Framing | Column & Beam | Q345B High strength low alloy H steel/I beam |
Crane Beam | Q345B High strength low alloy H steel/I beam | |
Secondary Framing | Purlin | C/Z section galvanized steel |
Bracing Framing | Angle steel/round pipe/round steel | |
Roof & Wall Cover | Panel Cover | Corrugated PPGI sheet 0.3-0.8mm |
Insulation | 50/75/100/120/150mm, EPS/PU/Fiberglass/rockwool sandwich panel | |
Fiberglass coil/EPE foam coil/Aluminum foil bubble coil | ||
Ventilation & Lighting | Windows | PVC steel/aluminium alloy/Louver |
Doors | Sliding steel door/Electric roller up door/worker door/fireproof door | |
Ventilation | Roof ridge skylight/Ventilator ball | |
Lighting | FRP panel, Standard Industrial LED Lighting, | |
Others | Drain | Free drain/Gutter Drain |
Connect | Bolt connect | |
Package | Standard transprot package |
Steel Structure Factory Feature
Firm Structure: Greatly safety and reliability of the building by good ductility & strong plastic deformation ability, steel factory can avoid the collapse in earthquake and typhoon disasters.
Fast Construction: 1/3 construction period of traditional construction way, a steel factory of 5,000 square meters, need 35 working days to complete the assembly by 10 workers.
Eco Friendly: 100% recycled, the building can also be disassembled and reassembled many times and reused, with a high utilization rate.
Economic: Steel structure factory improve the area utilization rate with flexible separation of large spaces, and greatly reduce basic work cost with half weight of concrete structure.
Steel Structure Factory More Details Show